Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
start [2026/09/30 09:55] – Richard Whitestart [2026/11/10 14:34] (current) – [Meetings calendar] Richard White
Line 59: Line 59:
 */ */
  
-=== 🌿 🐞 The next working session is on $[hdcolor $\brown$\$]Monday 5th October$[/hdcolor$] from $[hdcolor $\brown$\$]2 pm to 4 pm$[/hdcolor$] πŸ¦‹ 🌿 ===+=== 🌿 🐞 The next working session is on $[hdcolor $\brown$\$]Sunday 22nd November$[/hdcolor$] from $[hdcolor $\brown$\$]2 pm to 4 pm$[/hdcolor$] πŸ¦‹ 🌿 ===
  
 +<WRAP center round important>
 +We have cancelled the session planned for Saturday 14th November because of a number of absences.
 +</WRAP>
 +  
 /* /*
 Be prepared for light rain on Sunday afternoon. Be prepared for light rain on Sunday afternoon.
Line 84: Line 88:
 on a Monday, a Saturday and a Sunday as listed below. on a Monday, a Saturday and a Sunday as listed below.
 All sessions start at 2 p.m. and last two hours.   All sessions start at 2 p.m. and last two hours.  
- 
-/* 
-The **traffic light on the left** indicates whether the next session will go ahead --  
-**$[hdcolor $\green$\$]green$[/hdcolor$]** means OK (unless the forecast changes),  
-**$[hdcolor $\orange$\$]amber$[/hdcolor$]** means we're considering cancellation,  
-and **$[hdcolor $\red$\$]red$[/hdcolor$]** means the session has been cancelled. 
-*/ 
  
 Everyone --- including you --- is very welcome to come along to help us (no skills are required),  Everyone --- including you --- is very welcome to come along to help us (no skills are required), 
Line 110: Line 107:
  
 <WRAP box> <WRAP box>
-** <wrap hi>October</wrap> **+<wrap hi>** November **</wrap>
  
-<wrap hi>Monday 5th</wrap>\\Β +<del>Saturday 14th</del> -- <wrap em>cancelled</wrap>\\Β 
-Saturday 17th\\Β +<wrap hi>Sunday 22nd</wrap>
-Sunday 25thΒ +
-</WRAP>Β +
-Β +
-<WRAP box>Β +
-** November **Β +
-Β +
-Monday 2nd\\Β +
-Saturday 14th\\Β +
-Sunday 22nd+
 </WRAP> </WRAP>
  
Line 138: Line 126:
 Saturday 16th\\ Saturday 16th\\
 Sunday 24th Sunday 24th
 +</WRAP>
 +
 +<WRAP box>
 +** February 2027 **
 +
 +Monday 1st\\
 +Saturday 13th\\
 +Sunday 21st
 </WRAP> </WRAP>